THE RENOVATION EXPERIENCE

THE RENOVATION EXPERIENCE

We will continue in the renovations and we will stay in the south of France but with a renovation we will say in German.
Named SUPER SPIN from the Kmg factories in Holland, this model is now called the real name of Kmg. EXPERIENCE.
Its new owner, from a large family of fairgrounds (not by size) had stopped the holidays to start building (laughing box, containers, caravans). He was specialized in large containers of 13 meters and caravans of 15 meters. With children constantly asking him to go back to the lunaparks he bought an EXPERIENCE From Kmg. The second for France.
As soon as it arrives in the Avignon region, as soon as it is dismantled. But full disassembly. After having removed the wheels, the suspensions, the brakes, the pneumatic and electric cables of the trailer began a sandblasting of the whole frame. Then two coats of primer and 3 coats of Kmg red paint.
1. Then came the turn of the facade. Having spent many years in the beautiful English weather. (First country where windshield wipers wear out windshields) It was completely changed for the same but new steel. Suddenly the sheets and the light were also changed as well as the decorations. Continuing the intelligent renovation the facade now folds up with jacks. .
2 The trailer has also undergone the renovating madness of our great renovator (not the size) Starting from the ground. : the tires with Alcoa Durabright rims, the suspensions, the brakes, the wheel bearings, the air bottles and the pneumatic and electrical cabling as well as the LED lighting, EVERYTHING IS NEW.
3. The party rides. Removing the bolts and replacing them. Dismantling of hydraulic controls and replacement by wireless controls (more practical). Changes of barriers and posts with new powder coated. The front queue station changed. All lights and wiring discarded and replaced by LED models (the plates of the arms for the light are new). The central diamond, light and wiring and painting changed. All the covers of the electrical boxes and the cars changed by new ones. The hulls of the cars were repainted, the bulbs changed as well as the transformers. Control of the cooling of oil pumps by a professional. Verification by another gearbox professional
4. The cash register. Change of the chassis for a new one as well as a low body complement for the finish with a new paint of the whole.
5. Load change for ergonomic loading to save disassembly time. Result: 4 people 1 hour 40 minutes

Of course it all took time and a lot of money and especially Estelle's patience because now it is FOR SALE

EXPERIENCE